Due diligence is the period between signing a purchase contract and closing when you confirm the property is what the seller says it is: the income, the title, the zoning, the building, and the land. This checklist covers what most commercial buyers in Texas should review, grouped by category, with notes on risks that are specific to Texas. Your attorney, lender, and broker may add items for your deal.

Before the clock starts

  • Confirm how many days your feasibility or due diligence period runs, and when earnest money becomes non-refundable.
  • Ask your lender what reports they require (for example, a PCA under ASTM E2018-24, a Phase I under ASTM E1527-21, an appraisal, a survey).
  • Schedule inspections and the Phase I in the first few days. Records requests and contractor bids take time.
  • Request the seller’s documents in writing on day one.

Seller documents to request

  • Rent roll and all leases, with amendments
  • Trailing 12 months (T-12) operating statements and at least two prior years
  • Common area maintenance (CAM) reconciliations, for retail and NNN properties
  • Service contracts (landscaping, HVAC maintenance, elevators, security, trash)
  • Utility bills for the past 12 months
  • Property tax bills and any pending protests
  • Warranties (roof, HVAC, structural) and whether they transfer
  • Prior inspection reports, PCAs, and environmental reports
  • Permits, certificates of occupancy, and any open code violations
  • Insurance loss history

Leases and tenants

  • Compare each lease to the rent roll.
  • Get signed estoppel certificates from tenants confirming rent, term, and any disputes.
  • Look for unfunded tenant improvement allowances or free rent that transfer to you.
  • Check who is responsible for roof, structure, and HVAC repairs under each lease.
  • Note options to renew, terminate, or purchase.

Title, survey, and zoning

  • Review the title commitment and every exception listed in it.
  • Order an ALTA survey to show boundaries, easements, and encroachments.
  • Request a zoning verification letter from the city confirming your intended use.
  • If the current use is “grandfathered” (legal nonconforming), confirm it hasn’t lapsed and understand what would end it.
  • Check the FEMA flood map and get an elevation certificate if the property is near a flood zone.

Physical condition

  • A commercial inspection or a Property Condition Assessment, depending on what your lender requires
  • Repair cost estimates for anything the inspection finds
  • Roof condition, age, and any hail or storm claims. Drone thermal imaging can locate wet insulation under large flat roofs.
  • HVAC age and condition, using equipment nameplate dates
  • Foundation movement, with a foundation elevation survey if there are signs of it
  • Fire sprinkler, alarm, and life-safety inspection records
  • Accessibility, especially for retail and office buildings open to the public
  • Contractor bids for any large repair before you negotiate on it

Environmental

Texas-specific items

  • Property taxes. Texas appraises commercial property at market value each year. If you’re paying well above the current appraised value, budget for a higher appraisal next year rather than the seller’s current bill.
  • Special districts. Outside city limits, check for municipal utility district (MUD) or other special district taxes.
  • Expansive clay soils in DFW, Austin, and San Antonio: look closely at slab cracking, door frames, and masonry.
  • Coastal properties: ask for Texas Department of Insurance windstorm certificates for roof and structural work, and check flood history.
  • Edwards Aquifer: sites over the recharge zone in the San Antonio area have extra TCEQ rules for construction and site work.
  • Freeze history: ask what was damaged in Winter Storm Uri (February 2021) and how it was repaired.

Before closing

  • Negotiate price, seller credits, or repair escrows based on your findings.
  • If the seller agreed to make repairs, have the work checked before closing.
  • Confirm the Phase I is still within its 180-day window.
  • Review the final title policy and closing statement.

Frequently asked questions

How long is a typical due diligence period? It’s negotiated in the contract and varies by deal. Whatever the length, order inspections and the Phase I in the first few days so you have time to get bids and negotiate.

Do I need both a commercial inspection and a PCA? Usually one or the other. A PCA under ASTM E2018-24 is what most lenders ask for. A commercial inspection is often enough for cash purchases. See How Much Does a Commercial Property Inspection Cost in Texas?

Is a Phase I required? It isn’t required by law, but most lenders require one, and it’s how buyers qualify for federal landowner liability protections.

What if the inspection finds major problems? Get contractor bids, then negotiate a price reduction, a seller credit, a repair escrow, or seller repairs before closing. If the numbers no longer work, your due diligence period is your chance to walk away.

How do I read the reports? See How to Read a Property Condition Report.

About the author

Tony Pynes is a Certified Master Inspector specializing in commercial, industrial, and historical properties. TXCREI is a veteran-owned firm. Tony flies his Beechcraft Bonanza to sites anywhere in Texas at no travel charge. See our commercial inspection services, our Phase I ESA service, or request a quote.

Call Now Button